Runcorn EfW: Difference between revisions

569 bytes removed ,  31 March 2021
modified page structure
No edit summary
(modified page structure)
Line 1: Line 1:
[[Category:EfW Plants]]
{{#vardefine: epr|RP3638CG}}
{{EfWTemplate|EPR={{#var: epr}}|id=1}}
[[File:Viridor Runcorn pic.png|400px|left|Runcorn 1&2 ERF]]
[[File:Viridor Runcorn pic.png|400px|left|Runcorn 1&2 ERF]]
[[Category:EfW Plants]]
One of the largest [[ERF]] facilities in the UK with permitted operational capacity of 1,100,000 tonnes per annum, operated by [[Viridor]] and owned by [[Viridor]] and [[Ineous Chlor]]. Delivery of waste is by both road and rail and the facility processes both residual [[Household Waste]] and [[Commercial Waste]] in the form of [[RDF]]<ref name="run1">[https://www.viridor.co.uk/energy/energy-recovery-facilities/runcorn-erf/%20link Viridor Website]</ref>
{{EfWTemplate|EPR=RP3638CG|id=1}}
 
<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/runcorn-erf/ Runcorn EfW Site Photo]All Rights Reserved</ref>
<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/runcorn-erf/ Runcorn EfW Site Photo]All Rights Reserved</ref>
==Summary==
==Summary==
One of the largest [[ERF]] facilities in the UK with permitted operational capacity of 1,100,000 tonnes per annum, operated by [[Viridor]] and owned by [[Viridor]] and [[Ineous Chlor]]. Delivery of waste is by both road and rail and the facility processes both residual [[Household Waste]] and [[Commercial Waste]] in the form of [[RDF]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/runcorn-erf/%20link Viridor Website]</ref>
One of the largest [[ERF]] facilities in the UK with permitted operational capacity of 1,100,000 tonnes per annum, operated by [[Viridor]] and owned by [[Viridor]] and [[Ineous Chlor]]. Delivery of waste is by both road and rail and the facility processes both residual [[Household Waste]] and [[Commercial Waste]] in the form of [[RDF]]<ref name="run1" />


==History==
==History==
Line 14: Line 17:
The plant comprises 4 lines (2 in each phase) of standard combustion technology comprising [[Keppel Segher]]'s proprietary water-cooled grates, generating super-heated steam, and is configured to run on [[RDF]] with a 'design point' [[CV]] of 11.5MJ/kg
The plant comprises 4 lines (2 in each phase) of standard combustion technology comprising [[Keppel Segher]]'s proprietary water-cooled grates, generating super-heated steam, and is configured to run on [[RDF]] with a 'design point' [[CV]] of 11.5MJ/kg


==Local Authority Users==
==Local Authority Data==
The following  represents those local authorities recorded as putting tonnage into the site (either directly or via a transfer station). The tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018). A 'zero return' below indicates no local authority tonnage was recorded, most likely a result of the plant being recently commissioned and actually having received no tonnage. Equally, lower than expected tonnage maybe a result of either a new plant being in 'ramp up' towards full capacity after construction, or may be a result of plant shut down and subsequent re-start in a year.
{{EfWLAData|EPR={{#var: epr}}}}
{{#clear_external_data:}}
{{#get_db_data: db=engy
|from=wdfincin|where=epr='RP3638CG'|data=authority=authority,epr=epr,ton=ton}}
{|class="wikitable sortable"
! Authority
! Tonnage {{#for_external_table:<nowiki/>
{{!}}-
{{!}} [[{{{authority}}}]]
{{!}} {{{ton}}}
}}
|}


==References==
==References==
<references />
<references />