Runcorn EfW: Difference between revisions

m
no edit summary
m (add page specific text)
mNo edit summary
Line 3: Line 3:


==Summary==
==Summary==
[[File:Viridor Runcorn pic.png|400px|left|Runcorn 1&2 ERF (from )]]
[[File:Viridor Runcorn pic.png|400px|left|Runcorn 1&2 ERF]]
One of the largest [[ERF]] facilities in the UK with permitted operational capacity of 1,100,000 tonnes per annum, operated by [[Viridor]] and owned by [[Viridor]] and [[Ineous Chlor]]. Delivery of waste is by both road and rail and the facility processes both residual [[Household Waste]] and [[Commercial Waste]] in the form of [[RDF]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/runcorn-erf/%20link Viridor Website Link]</ref>
One of the largest [[ERF]] facilities in the UK with permitted operational capacity of 1,100,000 tonnes per annum, operated by [[Viridor]] and owned by [[Viridor]] and [[Ineous Chlor]]. Delivery of waste is by both road and rail and the facility processes both residual [[Household Waste]] and [[Commercial Waste]] in the form of [[RDF]]<ref>[https://www.viridor.co.uk/energy/energy-recovery-facilities/runcorn-erf/%20link Viridor Website Link]</ref>


banneredit
3,634

edits