==Plant==
==Plant==
Built by [[Keppel Seghers]] under a Design & Build [[EPC]]-turnkey contract phase 1 was commenced in 2009 and handed over in January 2015, and phase 2 was commenced in 2010 and handed over in April 2015 at a contract value of GBP £390 million <ref>[http://www.keppelseghers.com/en/content.aspx?sid=3028 Keppel Sehers Website]</ref>.
Built by [[Keppel Seghers]] under a Design & Build [[EPC]]-turnkey contract phase 1 was commenced in 2009 and handed over in January 2015, and phase 2 was commenced in 2010 and handed over in April 2015 at a contract value of GBP £390 million <ref>[http://www.keppelseghers.com/en/content.aspx?sid=3028 Keppel Sehers Website]</ref>.
The plant comprises 4 lines (2 in each phase) of standard combustion technology generating super-heated steam, and is configured to run on [[RDF]] with a 'design point' [[CV]] of 11.5MJ/kg
The plant comprises 4 lines (2 in each phase) of standard combustion technology comprising [[Keppel Segher]]'s proprietary water-cooled grates, generating super-heated steam, and is configured to run on [[RDF]] with a 'design point' [[CV]] of 11.5MJ/kg