==Plant== | ==Plant== | ||
The facility was delivered through a joint venture between Clugston and technology provider CNIM for FCC Environment under a Design and Build EPC-turnkey contract which was worth in the region of £145m.<ref> https://www.theconstructionindex.co.uk/news/view/clugston-ready-to-start-on-energy-from-waste-plant</ref>.The plant is capable of producing 11 MW net electricity for export to the grid and includes ancillary infrastructure such as landscaping, administration offices and a visitor centre.<ref> | The facility was delivered through a joint venture between Clugston and technology provider CNIM for FCC Environment under a Design and Build EPC-turnkey contract which was worth in the region of £145m.<ref> https://www.theconstructionindex.co.uk/news/view/clugston-ready-to-start-on-energy-from-waste-plant</ref>.The plant is capable of producing 11 MW net electricity for export to the grid and includes ancillary infrastructure such as landscaping, administration offices and a visitor centre.<ref>https://www.arup.com/projects/lincolnshire-waste-to-energy-facility</ref>. | ||
https://www.arup.com/projects/lincolnshire-waste-to-energy-facility</ref> | |||
The facility consists of one incinerator line with a total annual capacity of 154,000 tonnes per year (19.24tph) of waste materials with a design average lower calorific value (LCV) of approximately 9.3 MJ/Kg. Moving grate technology is used for burning the waste material <ref name="AR"/> | |||
==Local Authority Users== | ==Local Authority Users== |