(Created page with "Category:Biomass EfW Plants {{BiomassPlant|NAME=Ince|id=43}} 400px|left|Ince Bio Power. CoGen, 2018. ==Summary== A Biomass EfW...")
 
No edit summary
Line 15: Line 15:


==Summary==
==Summary==
A [[Biomass EfW]] facility based on 157,000 tonnes per annum of waste wood producing 21.5 MW of electricity that is exported to nPower under a long-term Power Purchase Agreement. The facility is located at Protos in Cheshire, and forms part of Peel Environmental’s ‘Protos’ energy hub located near Ellesmere Port (Lets Recycle, 2019). The waste wood feedstock is sourced locally through a feedstock contract with Ince Park Renewables<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020].</ref>.
A [[Biomass EfW]] facility based on 157,000 tonnes per annum of waste wood producing 21.5 MW of electricity that is exported to nPower under a long-term Power Purchase Agreement. The facility is located at Protos in Cheshire, and forms part of Peel Environmental’s ‘Protos’ energy hub located near Ellesmere Port<ref name="ref2" >Lets Recycle, 2019. [https://www.letsrecycle.com/news/latest-news/cheshire-waste-wood-gasification-facility-fully-operational/ Cheshire Waste Wood Gasification Facility ‘Fully Operational’ - Letsrecycle.com. Online.[Accessed 3 April 2020].]</ref>. The waste wood feedstock is sourced locally through a feedstock contract with Ince Park Renewables<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020].</ref>.


The operations & maintenance for the facility is being carried out by Stantec<ref name="ref1" />. Construction commenced in 2015 and Ince Bio Power becoming fully operational in March 2015<ref>Lets Recycle, 2019. [https://www.letsrecycle.com/news/latest-news/cheshire-waste-wood-gasification-facility-fully-operational/ Cheshire Waste Wood Gasification Facility ‘Fully Operational’ - Letsrecycle.com. Online.[Accessed 3 April 2020].]</ref>