{{BiomassPlant|NAME=Goosey Lodge|id=38}} | {{BiomassPlant|NAME=Goosey Lodge|id=38}} | ||
==Summary== | ==Summary== | ||
==Plant== | |||
Goosey Lodge biomass facility utilises a fluidised bed combuster system which enusres that any liquids and sludges with high biological or Chemical Oxygen Demands (BOD and COD respectively) can be oxidised efficiently<ref name="GOO">[http://www.ancillarycomponents.co.uk/wykinc.html/ Ancillary Components]</ref>. | |||
Goosey Lodge Power Plant was designed and built by Wykes Engineering, the group's Engineering Company.Wkes provided a turnkey solution to the project which included design to manufacture and full life cycle maintenance and project management<ref name ="GOO" />. | |||
==Refernces== |