Jump to content

Goosey Lodge Power Plant: Difference between revisions

m (→‎Plant: typo)
(→‎Plant: typo)
Line 4: Line 4:


==Plant==
==Plant==
Goosey Lodge biomass facility utilises a fluidised bed combustor system which enusres that any liquids and sludges with high biological or Chemical Oxygen Demands (BOD and COD respectively) can be oxidised efficiently<ref name="GOO">[http://www.ancillarycomponents.co.uk/wykinc.html/ Ancillary Components]</ref>.
Goosey Lodge biomass facility utilises a fluidised bed combustor system which ensures that any liquids and sludges with high Biological or Chemical Oxygen Demands (BOD and COD respectively) can be oxidised efficiently<ref name="GOO">[http://www.ancillarycomponents.co.uk/wykinc.html/ Ancillary Components]</ref>.


Goosey Lodge Power Plant was designed and built by Wykes Engineering, the group's Engineering Company. Wkes provided a turnkey solution to the project which included design to manufacture and full life cycle maintenance and project management<ref name ="GOO" />.
Goosey Lodge Power Plant was designed and built by Wykes Engineering, the group's Engineering Company. Wkes provided a turnkey solution to the project which included design to manufacture and full life cycle maintenance and project management<ref name ="GOO" />.


==References==
==References==
banneredit
1,703

edits