Goosey Lodge Power Plant: Difference between revisions

Line 3: Line 3:
==Summary==
==Summary==
Goosey Lodge is a biomass waste EfW generating 33MWe to the grid. It is located in Wymington near Rushton in Northamptonshire. The plant is able to combust a wide range of feedstock including solid and liquid animal by-products, fuels and waste wood and has a permitted tonnage threshold of 438,000 tonnes per annum<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/614334/Variation_notice.pdf/ Permit Variation Notice], EA</ref>.
Goosey Lodge is a biomass waste EfW generating 33MWe to the grid. It is located in Wymington near Rushton in Northamptonshire. The plant is able to combust a wide range of feedstock including solid and liquid animal by-products, fuels and waste wood and has a permitted tonnage threshold of 438,000 tonnes per annum<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/614334/Variation_notice.pdf/ Permit Variation Notice], EA</ref>.
The plant is owned by Ancillary Components Ltd.


==Plant==
==Plant==
banneredit
1,703

edits