Jump to content

Margam Green Energy Plant: Difference between revisions

m
minor text changes
m (Update links)
m (minor text changes)
Line 12: Line 12:
The plant became operational in 2019 at a cost of c.£160m<ref name="Marg" />.
The plant became operational in 2019 at a cost of c.£160m<ref name="Marg" />.


The Margam plant takes [[Wood Waste]] that is supplied by [[Stobart Biomass]] on a long term contract. The [[Wood Waste]] is sourced and supplied by [[Stobart Biomass]] from across the country at a rate of approximately 6,000 tonnes per week<ref name="Marg" />. The plant is also capable of processing contaminated wood and fuel containing metals with no pre-treatment required. The facility is also able to take municipal waste as a fuel source in the future if required<ref name="BVV" />.
The Margam plant takes [[Wood Waste]] that is supplied by [[Stobart Biomass]] on a long term contract. The [[Wood Waste]] is sourced and supplied by [[Stobart Biomass]] from across the country at a rate of approximately 6,000 tonnes per week/355,000 tonnes per year<ref name="Marg" />. The plant is also capable of processing contaminated wood and fuel containing metals with no pre-treatment required. The facility is also able to take municipal waste as a fuel source in the future if required<ref name="BVV" />.


==Plant==
==Plant==
banneredit
3,643

edits