Line 1: | Line 1: | ||
[[Category:Biomass EfW Plants]] | [[Category:Biomass EfW Plants]] | ||
{{BiomassPlant|NAME=Goosey Lodge|id=38}} | {{BiomassPlant|NAME=Goosey Lodge|id=38}} | ||
[[File:Goosey Lodge.jpg|400px|left|Goosey Lodge]] | [[File:Goosey Lodge.jpg|400px|left|Goosey Lodge]]__TOC__ | ||
<br clear="left"/> | <br clear="left"/> | ||
==Summary== | ==Summary== | ||
Goosey Lodge is a | Goosey Lodge is a [[Biomass Waste EFW]] generating 16MWe to the grid. It is located in Wymington near Rushton in Northamptonshire. The plant is able to process a wide range of feedstock including solid and liquid [[Animal By-product Material]] and [[Wood Waste]] and has a permitted tonnage threshold of up to 438,000 tonnes per annum<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/614334/Variation_notice.pdf/ Permit Variation Notice], EA</ref>. | ||
The plant is owned by Ancillary Components Ltd. | The plant is owned by [[Ancillary Components Ltd]]. | ||
==Plant== | ==Plant== | ||
Goosey Lodge biomass facility utilises two bubbling fluidised bed | Goosey Lodge biomass facility utilises two bubbling [[fluidised bed combustion systems]] which ensures that any liquids and sludges with high [[Biological or Chemical Oxygen Demand]] (BOD and COD respectively) can be oxidised efficiently<ref name="GOO">[http://www.ancillarycomponents.co.uk/wykinc.html/ Ancillary Components]</ref>. Each fluidised bed incinerator has a capacity of up to 25 tonnes per hour equating to a maximum throughput of 438,000 tonnes per annum<ref>[https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/614334/Variation_notice.pdf/ Permit Variation Notice], EA</ref>. | ||
Goosey Lodge Power Plant was designed and built by Wykes Engineering, the group's Engineering Company. | Goosey Lodge Power Plant was designed and built by [[Wykes Engineering]], the group's Engineering Company. Wykes provided a turnkey solution to the project which included design to manufacture and full life cycle maintenance and project management<ref name ="GOO" />. | ||
==Tonnage Input/Fuel== | |||
The tonnage received by the plant is a mixture of [[Biomass]] and in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> [[Ofgem]] reported the following fuel received ([[Wood Waste]] representing 7% of input): | |||
{| class="wikitable" | |||
|- | |||
! Biomass !! Tonnage (2018-19) | |||
|- | |||
| [[Wood Waste]] || '''3,774''' | |||
|- | |||
| [[MBM]] || 51,134 | |||
|- | |||
| Other || 0 | |||
|- | |||
| Total||54,908 | |||
|} | |||
The [[Wood Waste]] tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and were '''33,821''' tonnes. | |||
==References== | ==References== |