banneredit
3,643
edits
m (→Summary) |
m (tonnage data added) |
||
Line 1: | Line 1: | ||
[[Category:Biomass EfW Plants]] | [[Category:Biomass EfW Plants]] | ||
{{BiomassPlant|NAME=Holbrook Community Renewable Energy Centre|id=40}} | {{BiomassPlant|NAME=Holbrook Community Renewable Energy Centre|id=40}} | ||
[[File:Holbrook Biomass.jpg|400px|left|Holbrook Community Renewable Energy Centre]] | [[File:Holbrook Biomass.jpg|400px|left|Holbrook Community Renewable Energy Centre]]__TOC__ | ||
<br clear='left'/> | |||
==Summary== | ==Summary== | ||
A [[Biomass EfW]] facility based on 55,000 tonnes per annum of | A [[Biomass EfW]] facility based on up to 55,000 tonnes per annum of [[Wood Waste]] producing 6.5 MWe gross power to be exported to the national grid. This facility is a [[Combined Heat and Power]] (CHP) plant, enough heat is produced and harnessed to supply approximately 6,700 local homes and commercial properties. Holbrook Community Renewable Energy Centre is located in Sheffield<ref name="ref1" >Date, 2017. [https://www.letsrecycle.com/news/latest-news/mid-uk-supplies-waste-wood-for-sheffield-biomass-facility/ Mid UK Supplies Waste Wood For Sheffield Biomass Facility. Online. letsrecycle.com. [Accessed 14 April 2020].]</ref>. | ||
The | The [[Wood Waste]] feedstock is locally supplied by [[Mid UK Recycling]]. The operator of this facility is [[Veolia Energy Services Ltd]]<ref name="ref1" />. | ||
==Plant== | ==Plant== | ||
The Design and Build EPC contractor for this development was Kandor Energy Ltd<ref>Kandor Energy, 2020. [https://www.kantorenergy.com/holbrook-community-renewable-energy-centre Kantor Energy - Holbrook Community Renewable Energy Centre. Online. Kantorenergy.com. [Accessed 14 April 2020].]</ref>. | The Design and Build [[EPC]] contractor for this development was [[Kandor Energy Ltd]]<ref>Kandor Energy, 2020. [https://www.kantorenergy.com/holbrook-community-renewable-energy-centre Kantor Energy - Holbrook Community Renewable Energy Centre. Online. Kantorenergy.com. [Accessed 14 April 2020].]</ref>. | ||
The facility cost £30m to develop and became operational in 2017<ref>Recycling and Waste World, 2017. [https://www.recyclingwasteworld.co.uk/business/sheffield-renewable-energy-centre-opts-for-biomass-wood-chip-from-mid-uk-recycling/154126/ Sheffield Renewable Energy Centre Opts For Biomass Wood Chip From Mid UK Recycling. Online Recyclingwasteworld.co.uk. [Accessed 14 April 2020].]</ref> | The facility cost £30m to develop and became operational in 2017<ref>Recycling and Waste World, 2017. [https://www.recyclingwasteworld.co.uk/business/sheffield-renewable-energy-centre-opts-for-biomass-wood-chip-from-mid-uk-recycling/154126/ Sheffield Renewable Energy Centre Opts For Biomass Wood Chip From Mid UK Recycling. Online Recyclingwasteworld.co.uk. [Accessed 14 April 2020].]</ref> | ||
The technology utilised in this facility is two water-cooled moving grate furnaces that are supplied by Turboden Srl (part of the Mitsubishi Heavy Industries Group). Turboden Srl also supplied the | The technology utilised in this facility is two water-cooled moving grate furnaces that are supplied by [[Turboden Srl]] (part of the [[Mitsubishi Heavy Industries Group]]). [[Turboden Srl]] also supplied the ‘[[organic rankin cycle]]’ (ORC) turbogenerators with air condensers for the facility which uses ‘organic fluid’ vapour as the driving force for the turbine within a closed loop heating circuit<ref name="ref1" />. | ||
== | ==Tonnage Input/Fuel== | ||
The tonnage received by the plant is only [[Wood Waste]] [[Biomass]] and in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> [[Ofgem]] reported the following fuel received: | |||
{| class="wikitable" | |||
|- | |||
! Biomass !! Tonnage (2018-19) | |||
|- | |||
| [[Wood Waste]] || '''21,188''' | |||
|- | |||
| Other || 0 | |||
|- | |||
| Total||21,188 | |||
|} | |||
The [[Wood Waste]] tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and were '''33,821''' tonnes. | |||
==References== | ==References== | ||
<references/> | <references/> |