Barry Dock – Biomass No 2: Difference between revisions

m
minor text changes
(Created page with "Category:Biomass EfW Plants {{BiomassPlant|NAME=Barry|id=10}} 400px|left|Barry Biomass EfW. Lets Recycle, 2020. ==Summary== A Biomass Waste...")
 
m (minor text changes)
Line 1: Line 1:
[[Category:Biomass EfW Plants]]
[[Category:Biomass EfW Plants]]
{{BiomassPlant|NAME=Barry|id=10}}
{{BiomassPlant|NAME=Barry|id=10}}
[[File:Barry-Biomass.png|400px|left|Barry Biomass EfW. Lets Recycle, 2020.]]
[[File:Barry-Biomass.png|400px|left|Barry Biomass EfW. Lets Recycle, 2020.]]__TOC__
 
<br clear='left'/>
 
 


==Summary==
==Summary==
A Biomass Waste EFW facility based on 86,000 tonnes per annum of [[Wood Waste]] generating 10MWe to be exported to the local grid. The facility is located off Woodham Road, Barry, Vale of Glamorgan. The waste wood feedstock consumed at this facility comes from a variety of sources including municipal recycling centres and manufacturing companies<ref name="ref1" >Lets Recycle, 2020. [https://www.letsrecycle.com/news/latest-news/barry-biomass-final-tests/ Barry Biomass Undergoing Final Tests - Letsrecycle.com. Online. [Accessed 3 April 2020].]</ref>.
A Biomass Waste EFW facility based processing up to 86,000 tonnes per annum of [[Wood Waste]] generating 10MWe to be exported to the local grid. The facility is located off Woodham Road, Barry, Vale of Glamorgan. The [[Wood Waste]] feedstock consumed at this facility comes from a variety of sources including municipal recycling centres and manufacturing companies<ref name="ref1" >Lets Recycle, 2020. [https://www.letsrecycle.com/news/latest-news/barry-biomass-final-tests/ Barry Biomass Undergoing Final Tests - Letsrecycle.com. Online. [Accessed 3 April 2020].]</ref>.


Construction of this facility began in 2016 and entered the commissioning stage in 2019, becoming fully operational in 2020<ref name="ref1" />.
Construction of this facility began in 2016 and entered the commissioning stage in 2019, becoming fully operational in 2020<ref name="ref1" />.


Operations are carried out by Barry Biomass, which is fully monitored by [[Natural Resources Wales]] (NRW)<ref name="ref2" >Barry Biomass, 2020. [https://www.barrybiomass.co.uk/English#about Welcome To Barry Biomass. Online. Barry Biomass. [Accessed 3 April 2020]]</ref>.
Operations are carried out by [[Barry Biomass]], which is fully monitored by [[Natural Resources Wales]] (NRW)<ref name="ref2" >Barry Biomass, 2020. [https://www.barrybiomass.co.uk/English#about Welcome To Barry Biomass. Online. Barry Biomass. [Accessed 3 April 2020]]</ref>.


==Plant==
==Plant==
The facility is owned by an investment fund managed and financed by Aviva Investors<ref name="ref2" />
The facility is owned, managed and financed by [[Aviva Investors]]<ref name="ref2" />


[[Gasification]] technology is implemented to recover energy<ref name="ref2" />.
[[Gasification]] technology is implemented to recover energy<ref name="ref2" />.


==Local Authority Users==
==Tonnage Input/Fuel==
There is no tonnage reported as received by the plant in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> reported by [[Ofgem]] as the plant only became fully operational in late 2019/early 2020. Equally there is no historical tonnage received and recorded in the [[NRW]] statistics as these are recorded and only available on a calendar year basis up to the end of 2018 (i.e. January 2018 to December 2018).