Jump to content

Lincolnshire EFW: Difference between revisions

m
minor text change
No edit summary
m (minor text change)
Line 5: Line 5:
==Summary==
==Summary==


An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. The North Hykenham Energy from Waste facility, as its also known, has a permitted operational capacity of 190,000 tonnes per annum, and is owned and operated by FCC Environment. The waste arrives on 10 and 25 tonne collection vehicles from the local Lincoln area and five waste transfer stations based in Boston, Gainsborough, Grantham, Louth and Sleaford. <ref name="NH">https://www.fccenvironment.co.uk/green-energy/lincoln/</ref> The facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]].
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. The '''North Hykenham Energy from Waste facility''', as its also known, has a permitted operational capacity of 190,000 tonnes per annum, and is owned and operated by FCC Environment. The waste arrives on 10 and 25 tonne collection vehicles from the local Lincoln area and five waste transfer stations based in Boston, Gainsborough, Grantham, Louth and Sleaford. <ref name="NH">https://www.fccenvironment.co.uk/green-energy/lincoln/</ref> The facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]].


The facility is located on a 5 hectare site in Lincolnshire (just outside the village of North Hykenham) about 1.5km Northwest of Lincoln City.<ref name="AR">https://www.whatdotheyknow.com/request/260104/response/645233/attach/20/2014%20Annual%20Performance%20Report.pdf</ref>
The facility is located on a 5 hectare site in Lincolnshire (just outside the village of North Hykenham) about 1.5km Northwest of Lincoln City.<ref name="AR">https://www.whatdotheyknow.com/request/260104/response/645233/attach/20/2014%20Annual%20Performance%20Report.pdf</ref>
banneredit
3,643

edits