Jump to content

Cauldon Cement Kiln: Difference between revisions

m (Update links)
Line 22: Line 22:


==Waste Used on Site==
==Waste Used on Site==
The Cauldon site waste return to the [[EA]] for the most recent year of 2018 showed 58,741 tonnes of the following wastes used on site, which were used primary for the purpose of substituting fuel requirements in the plant:
The Cauldon site waste return to the [[EA]] for the most recent year showed 58,741 tonnes of the following wastes used on site, which were used primary for the purpose of substituting fuel requirements in the plant:
{{CKWaste|EPR=TP3334AW}}
{{CKWaste|EPR=TP3334AW}}


==References==
==References==
<references />
<references />