==Plant==
==Plant==
Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract . Construction started in September 2013 and was completed in June 2016 at a reported<ref>[http://www.hz-inova.com/cms/wp-content/uploads/2016/05/Buckinghamshire_Online_E.pdf Hitachi Zosen Inova Website]</ref> GBP £210m capital cost.
Built by [[Hitachi Zosen Inova]] under a Design & Build [[EPC]]-turnkey contract . Construction started in September 2013 and was completed in June 2016 at a reported<ref>[https://www.hz-inova.com/projects/buckinghamshire-uk/ Hitachi Zosen Inova Website]</ref> GBP £210m capital cost.
The plant comprises 1 line of 37.5 tonnes/hour (maximum 39.4 tonnes/hour) with a design capacity capable of treating 300,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] with a [[CV]] of between 7.5 and 12.5MJ/kg delivering between 27.7 MWe and 29.4 MWe output with up to 6.6 MWth of district heating output.
The plant comprises 1 line of 37.5 tonnes/hour (maximum 39.4 tonnes/hour) with a design capacity capable of treating 300,000 tonnes per annum via standard combustion technology, air cooled, Hitachi Zosen Inova Grate, generating super-heated steam, and is configured to run on residual [[Household Waste]] and [[Commercial Waste]] with a [[CV]] of between 7.5 and 12.5MJ/kg delivering between 27.7 MWe and 29.4 MWe output with up to 6.6 MWth of district heating output.