Jump to content

Levenseat EfW: Difference between revisions

no edit summary
m (add new link)
No edit summary
Line 1: Line 1:
[[File:Levenseat.png|400px|left|Aerial Picture of Levenseat in May 2018 - Letsrecycle Article ]]
{{#vardefine:epr|Tbc#04}}[[Category:EfW Plants]]
[[Category:EfW Plants]]
The Levenseat facility comprises a [[MRF]] and the adjacent [[Levenseat EfW]] facility which is based upon [[Gasification]] technology. [[Levenseat EfW Phase 2]] is the second phase of the [[EfW]] development which is adjacent to the current facility. The capacity is reported as 42 tonnes per hour through the [[MRF]] (or around 215,000 tonnes per annum) producing [[RDF]] for the adjacent [[EfW]] plant of around 100,000 tonnes per annum<ref>https://www.riddellpm.co.uk/projects/levenseat-efw-plant/</ref>.
{{EfWTemplate|EPR=Tbc#04|id=57}}
{{EfWTemplate|EPR={{#var:epr}}|id=57}}[[File:Levenseat.png|400px|left|Aerial Picture of Levenseat in May 2018 - Letsrecycle Article ]]__TOC__<br clear='left' />


==Summary==
==Summary==
Line 16: Line 16:
==Waste Input==
==Waste Input==
The plant is designed to run on [[RDF]] manufactured from residual [[Household Waste]] and [[Commercial Waste]], with preparation on site in the adjacent, larger scale [[MRF]].  
The plant is designed to run on [[RDF]] manufactured from residual [[Household Waste]] and [[Commercial Waste]], with preparation on site in the adjacent, larger scale [[MRF]].  
==Local Authority Users==
{{EfWLAData|EPR={{#var: epr}}}}


==References==
==References==
<references />
<references />
banneredit
2,363

edits