banneredit
2,363
edits
m (add new link) |
Arctellion (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
[[ | {{#vardefine:epr|Tbc#04}}[[Category:EfW Plants]] | ||
[[ | The Levenseat facility comprises a [[MRF]] and the adjacent [[Levenseat EfW]] facility which is based upon [[Gasification]] technology. [[Levenseat EfW Phase 2]] is the second phase of the [[EfW]] development which is adjacent to the current facility. The capacity is reported as 42 tonnes per hour through the [[MRF]] (or around 215,000 tonnes per annum) producing [[RDF]] for the adjacent [[EfW]] plant of around 100,000 tonnes per annum<ref>https://www.riddellpm.co.uk/projects/levenseat-efw-plant/</ref>. | ||
{{EfWTemplate|EPR= | {{EfWTemplate|EPR={{#var:epr}}|id=57}}[[File:Levenseat.png|400px|left|Aerial Picture of Levenseat in May 2018 - Letsrecycle Article ]]__TOC__<br clear='left' /> | ||
==Summary== | ==Summary== | ||
Line 16: | Line 16: | ||
==Waste Input== | ==Waste Input== | ||
The plant is designed to run on [[RDF]] manufactured from residual [[Household Waste]] and [[Commercial Waste]], with preparation on site in the adjacent, larger scale [[MRF]]. | The plant is designed to run on [[RDF]] manufactured from residual [[Household Waste]] and [[Commercial Waste]], with preparation on site in the adjacent, larger scale [[MRF]]. | ||
==Local Authority Users== | |||
{{EfWLAData|EPR={{#var: epr}}}} | |||
==References== | ==References== | ||
<references /> | <references /> |