Jump to content

Dimmer Landfill Site: Difference between revisions

m
change template
m (minor text change)
m (change template)
 
Line 33: Line 33:
Elsewhere within the site complex, Viridor also developed a [[Composting]] facility and an [In-vessel Composting]] ([[IVC]]) facility to deal with some of [[Somerset County Council]]'s separately collected [[Green Waste]] and some [[Food Waste]]. This facility is no longer in operation and has been converted to be used as a Waste Transfer Station. Whilst a planning consent was granted for an [[Anaerobic Digestion]] facility this was not built, with this infrastructure being built at [[Walpole Recovery Facility and Landfill Site]] instead.
Elsewhere within the site complex, Viridor also developed a [[Composting]] facility and an [In-vessel Composting]] ([[IVC]]) facility to deal with some of [[Somerset County Council]]'s separately collected [[Green Waste]] and some [[Food Waste]]. This facility is no longer in operation and has been converted to be used as a Waste Transfer Station. Whilst a planning consent was granted for an [[Anaerobic Digestion]] facility this was not built, with this infrastructure being built at [[Walpole Recovery Facility and Landfill Site]] instead.


==Tonnage Handled==
Only Waste Codes receiving over 5,000t are shown.
{{NHLFTable|Permit=UP3139BB}}
{{NHLFTable|Permit=UP3139BB}}


==References==
==References==
<references />
<references />
banneredit
3,643

edits