banneredit
3,643
edits
No edit summary |
m (updated link) |
||
Line 224: | Line 224: | ||
The landfill operator is required to continue to maintain monitoring and management of the site post-closure until it can be shown to the satisfaction of the [[EA]] that the active management of the site by the operator is no longer required. Assessment of such a state is measured against criteria identified in WMP26A<ref name="refA" /> and subsequent [[EA]] guidance. It is generally accepted for non-hazardous landfill sites that this is unlikely to be able to shown for at least 60 years post-closure, probably somewhat longer. This period is known as the '''aftercare''' period. | The landfill operator is required to continue to maintain monitoring and management of the site post-closure until it can be shown to the satisfaction of the [[EA]] that the active management of the site by the operator is no longer required. Assessment of such a state is measured against criteria identified in WMP26A<ref name="refA" /> and subsequent [[EA]] guidance. It is generally accepted for non-hazardous landfill sites that this is unlikely to be able to shown for at least 60 years post-closure, probably somewhat longer. This period is known as the '''aftercare''' period. | ||
There is published guidance on landfill permit surrender available from the [[EA]]<ref>Additional guidance for Landfill (EPR 5.02) and other permanent deposits of waste - How to surrender your environmental permit</ref>. | There is published guidance on landfill permit surrender available from the [[EA]]<ref>Additional guidance for Landfill (EPR 5.02) and other permanent deposits of waste - How to surrender your environmental permit</ref>and guidance was updated in March 2022<ref>https://www.gov.uk/government/publications/landfill-epr-502-and-other-permanent-deposits-of-waste-how-to-surrender-your-environmental-permit?</ref>. | ||
===Settlement and Surcharge=== | ===Settlement and Surcharge=== |