banneredit
3,643
edits
Arctellion (talk | contribs) No edit summary |
(remove old permit reference) |
||
Line 21: | Line 21: | ||
==Waste Used on Site== | ==Waste Used on Site== | ||
There is no waste return for the Tunstead site to the [[EA]] available for the most recent year, but the Tarmac website talks about using alternative fuels to substitute over 50% of its energy needs with a long term target of 70% focused on tyres and solvents/liquid fuels<ref>[https://www.tarmac.com/tunstead/environment/ Tarmac/Tunstead Website - Environment]</ref> and is documented as receiving [[MBM]] from 2013 in the Cement Plants and Kilns in Britain and Ireland. | There is no waste return for the Tunstead site to the [[EA]] available for the most recent year, but the Tarmac website talks about using alternative fuels to substitute over 50% of its energy needs with a long term target of 70% focused on tyres and solvents/liquid fuels<ref>[https://www.tarmac.com/tunstead/environment/ Tarmac/Tunstead Website - Environment]</ref> and is documented as receiving [[MBM]] from 2013 in the Cement Plants and Kilns in Britain and Ireland. | ||
{{EAIn|EPR=XP3532DP}} | {{EAIn|EPR=XP3532DP}} | ||
==References== | ==References== | ||
<references /> | <references /> |