Jump to content

Waste Managment Plan for England: Difference between revisions

new text
(new text)
(new text)
Line 10: Line 10:
*An assessment of the need for the closure of existing waste installations and for additional waste installation infrastructure in accordance with the proximity principle. An assessment of the investments and other financial means, including for [[Local Authority|local authorities]], required to meet those needs is carried out;   
*An assessment of the need for the closure of existing waste installations and for additional waste installation infrastructure in accordance with the proximity principle. An assessment of the investments and other financial means, including for [[Local Authority|local authorities]], required to meet those needs is carried out;   
*Information on the measures to attain the objective of diverting [[waste]] suitable for [[recycling]] or other [[recovery]] (in particular municipal waste) away from [[landfill]] or in other strategic documents;  
*Information on the measures to attain the objective of diverting [[waste]] suitable for [[recycling]] or other [[recovery]] (in particular municipal waste) away from [[landfill]] or in other strategic documents;  
*
*An assessment of existing [[Collection System Design|waste collection schemes]], including the material and territorial coverage of separate collection and measures to improve its operation, of any exceptions to requirements to collect [[waste]] separately, and of the need for new collection schemes;
*Sufficient information on the location criteria for site identification and on the capacity of future disposal or major recovery installations, if necessary;
*General waste management policies, including planned waste management technologies and methods, or policies for waste posing specific management problems;
*Measures to combat and prevent all forms of littering and to clean up litter;
*Appropriate qualitative or quantitative indicators and targets, including on the quantity of generated [[waste]] and its [[treatment]] and on [[Municipal Solid Waste|municipal waste]] that is disposed of or subject to [[Energy Recovery|energy recovery]];
*Waste management plans must:
**include the measures to be taken so that, by 2035:
***the preparing for re-use and the recycling of municipal waste is increased to a minimum of 65% by weight.
***the amount of municipal waste landfilled is reduced to 10% or less of the total amount of municipal waste generated (by weight).
 
 
==References==
==References==
<references />.
<references />.
banneredit
1,703

edits