banneredit
3,643
edits
(add new link) |
(add page specific text) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{#vardefine:epr| | {{#vardefine:epr|PPC/A/1150156}}[[Category:EfW Plants]] | ||
The Levenseat facility comprises a [[MRF]] and the adjacent [[Levenseat EfW]] facility which is based upon [[Gasification]] technology. [[Levenseat EfW Phase 2]] is the second phase of the [[EfW]] development which is adjacent to the current facility. The capacity is reported as 42 tonnes per hour through the [[MRF]] ( | The Levenseat facility comprises a [[MRF]] and the adjacent [[Levenseat EfW]] facility which is based upon [[Gasification]] technology. [[Levenseat EfW Phase 2]] is the second phase of the [[EfW]] development which is adjacent to the current facility. The capacity is reported as 42 tonnes per hour through the [[MRF]] (250,000 tonnes per annum) producing [[RDF]] for the adjacent [[EfW]] plant of 110,000 tonnes per annum<ref>EfW Annual Report</ref>. | ||
{{EfWTemplate|EPR={{#var:epr}}|id=57}}[[File:Levenseat.png|400px|left|Aerial Picture of Levenseat in May 2018 - Letsrecycle Article ]]__TOC__<br clear='left' /> | {{EfWTemplate|EPR={{#var:epr}}|id=57}}[[File:Levenseat.png|400px|left|Aerial Picture of Levenseat in May 2018 - Letsrecycle Article ]]__TOC__<br clear='left' /> | ||
Line 17: | Line 17: | ||
The plant is designed to run on [[RDF]] manufactured from residual [[Household Waste]] and [[Commercial Waste]], with preparation on site in the adjacent, larger scale [[MRF]]. | The plant is designed to run on [[RDF]] manufactured from residual [[Household Waste]] and [[Commercial Waste]], with preparation on site in the adjacent, larger scale [[MRF]]. | ||
==Local Authority Data== | |||
The [[Residual EfW]] pages for sites located in England and Wales capture the data reported by Local Authorities, through [[WasteDataFlow]], received at those sites. In Scotland this data is not reported, meaning that the destination in [[WasteDataFlow]] is not defined and the origin in the regulator returns for a facility receiving the tonnage is also not reported (resulting in a 'NA' in the table in the section below). As a result it is not possible to report for Scottish sites in the same way as other sites in WikiWaste. | |||
{{EAIn|EPR={{#var: epr}}}} | {{EAIn|EPR={{#var: epr}}}} | ||
==References== | ==References== | ||
<references /> | <references /> |