A Biomass Waste EFW facility [[Barry Dock – Biomass No 2]] is based processing up to 86,000 tonnes per annum of [[Wood Waste]] generating 10MWe to be exported to the local grid. The facility is located off Woodham Road, Barry, Vale of Glamorgan. | |||
[[Category:Biomass EfW Plants]]{{#vardefine: epr|AB3790ZB}} | [[Category:Biomass EfW Plants]]{{#vardefine: epr|AB3790ZB}} | ||
{{BiomassPlant|NAME=Barry Dock – Biomass No 2|id=10|EPR={{#var: epr}}}} | {{BiomassPlant|NAME=Barry Dock – Biomass No 2|id=10|EPR={{#var: epr}}}} | ||
Line 6: | Line 7: | ||
==Summary== | ==Summary== | ||
A Biomass Waste EFW facility based processing up to 86,000 tonnes per annum of [[Wood Waste]] generating 10MWe to be exported to the local grid. The facility is located off Woodham Road, Barry, Vale of Glamorgan. The [[Wood Waste]] feedstock consumed at this facility comes from a variety of sources including municipal recycling centres and manufacturing companies<ref name="ref1" >Lets Recycle, 2020. [https://www.letsrecycle.com/news/latest-news/barry-biomass-final-tests/ Barry Biomass Undergoing Final Tests - Letsrecycle.com. Online. [Accessed 3 April 2020].]</ref>. | A Biomass Waste EFW facility [[Barry Dock – Biomass No 2]] is based processing up to 86,000 tonnes per annum of [[Wood Waste]] generating 10MWe to be exported to the local grid. The facility is located off Woodham Road, Barry, Vale of Glamorgan. The [[Wood Waste]] feedstock consumed at this facility comes from a variety of sources including municipal recycling centres and manufacturing companies<ref name="ref1" >Lets Recycle, 2020. [https://www.letsrecycle.com/news/latest-news/barry-biomass-final-tests/ Barry Biomass Undergoing Final Tests - Letsrecycle.com. Online. [Accessed 3 April 2020].]</ref>. | ||
Construction of this facility began in 2016 and entered the commissioning stage in 2019<ref name="ref1" />. It was reported in August 2021 that commissioning had resumed after pausing in April 2020<ref>[https://www.letsrecycle.com/news/latest-news/commissioning-of-barry-biomass-gasifier-restarts/ Letsrecycle Article August 2021]</ref> | Construction of this facility began in 2016 and entered the commissioning stage in 2019<ref name="ref1" />. It was reported in August 2021 that commissioning had resumed after pausing in April 2020<ref>[https://www.letsrecycle.com/news/latest-news/commissioning-of-barry-biomass-gasifier-restarts/ Letsrecycle Article August 2021]</ref> |