banneredit
3,643
edits
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
Also known as Evermore [[Lisahally Power Station]] is a [[Combined Heat and Power]] [[Biomass EfW]] facility based on processing up to 110,000 tonnes per annum of [[ | Also known as Evermore [[Lisahally Power Station]] is a [[Combined Heat and Power]] [[Biomass EfW]] facility based on processing up to 110,000 tonnes per annum of [[Wood Waste]] producing 15.8 MW of electricity and 6 MW of heat. The facility is located in Derry in Northern Ireland<ref name="ref1" >BWSC, 2020. [https://www.bwsc.com/references/lisahally-biomass-plant Lisahally Biomass Plant. Online. Bwsc.com. [Accessed 20 April 2020].]</ref>. | ||
[[Category:Biomass EfW Plants]]{{#vardefine: epr|tbc1}} | [[Category:Biomass EfW Plants]]{{#vardefine: epr|tbc1}} | ||
{{BiomassPlant|NAME=Lisahally Power Station|id=51|EPR={{#var: epr}}}} | {{BiomassPlant|NAME=Lisahally Power Station|id=51|EPR={{#var: epr}}}} | ||
Line 5: | Line 5: | ||
<br clear='left'/> | <br clear='left'/> | ||
==Summary== | ==Summary== | ||
Also known as Evermore [[Lisahally Power Station]] is a [[Combined Heat and Power]] [[Biomass EfW]] facility based on processing up to 110,000 tonnes per annum of [[ | Also known as Evermore [[Lisahally Power Station]] is a [[Combined Heat and Power]] [[Biomass EfW]] facility based on processing up to 110,000 tonnes per annum of [[Wood Waste]] producing 15.8 MW of electricity and 6 MW of heat. The facility is located in Derry in Northern Ireland<ref name="ref1"/>. The feedstock is supplied locally under a long-term fuel contract with [[Stobart Biomass]] and the energy generated is purchased under a long-term contact with [[Power NI]]<ref>Evermore Energy, 2020. [https://evermoreenergy.com/ Home - Evermore Energy. Lisahally Biomass CHP Plant. Online. Evermore Energy. [Accessed 20 April 2020].]</ref>. | ||
The facility was developed by [[Evermore Energy]] (ERE Developments Limited), and is operated by [[Burmeister Wain Scandinavian Contractor]] (BWSC), who also provided turnkey [[EPC]] services for this facility. Operations started at the end of 2015 after construction began in mid-2013<ref name="ref1"/>. | The facility was developed by [[Evermore Energy]] (ERE Developments Limited), and is operated by [[Burmeister Wain Scandinavian Contractor]] (BWSC), who also provided turnkey [[EPC]] services for this facility. Operations started at the end of 2015 after construction began in mid-2013<ref name="ref1"/>. |