Jump to content

Templeborough Biomass Power Plant: Difference between revisions

no edit summary
No edit summary
No edit summary
 
Line 1: Line 1:
A [[Biomass EfW]] facility with [[CHP]] [[Templeborough Biomass Power Plant]] is based on processing up to 260,000 tonnes per annum of [[Wood Waste]] pellet generating 41 MWe<ref name="tem">[https://www.templeboroughbiomass.com/templeborough-biomass-power-plant/ Templeborough Biomass Plant]</ref>. The plant is located in Templeborough on the River Don, near Rotherham.
[[Category:Biomass EfW Plants]]{{#vardefine: epr|GP3433WS}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|GP3433WS}}
{{BiomassPlant|NAME=Templeborough Biomass Power Plant Ltd|id=80|EPR={{#var: epr}}}}
{{BiomassPlant|NAME=Templeborough Biomass Power Plant|id=80|EPR={{#var: epr}}}}
[[File:Templeborough.jpg|300px|left]]__TOC__
[[File:Templeborough.jpg|300px|left]]__TOC__
<br clear="left"/>
<br clear="left"/>


==Summary==
==Summary==
A [[Biomass]] Waste CHP EfW facility based on up to 260,000 tonnes per annum of [[Wood Waste]] pellet generating 41 MWe<ref name="tem">[https://www.templeboroughbiomass.com/templeborough-biomass-power-plant/ Templeborough Biomass Plant]</ref>. The plant is located in Templeborough on the River Don, near Rotherham.
A [[Biomass EfW]] facility with [[CHP]] [[Templeborough Biomass Power Plant]] is based on processing up to 260,000 tonnes per annum of [[Wood Waste]] pellet generating 41 MWe<ref name="tem" />. The plant is located in Templeborough on the River Don, near Rotherham.


The Templeborough site was originally developed by [[Bright Partnerships]] who secured the site and the planning consent to develop the biomass facility. At financial close [[Copenhagen Infrastrucutre Partners]] (CIP), who provided the equity and debt finance for the scheme, purchased the project and setting up the new operating company [[Templeborough Biomass Power Plant Ltd]]<ref name="pdf"[>http://www.volund.dk/~/media/Downloads/Brochures_-_BIO/Templeborough_-_Rotherham_-_England.pdf/Volund/dk]</ref>. In October 2019 London based [[Greencoat Capital]] announced that it had signed an agreement to acquire 100% of Templeborough Biomass Power Plant Ltd from CIP. This project is the company's first move into bioenergy assets<ref>[http://cipartners.dk/greencoat-capital-agrees-first-biomass-acquisition-40mw-templeborough-biomass-power-plant-from-copenhagen-infrastructure-partners/ CIP]</ref>.The total cost of the project was c.£200m GBP<ref>http://www.volund.dk/Biomass_energy/References/Templeborough</ref>.
The Templeborough site was originally developed by [[Bright Partnerships]] who secured the site and the planning consent to develop the biomass facility. At financial close [[Copenhagen Infrastrucutre Partners]] (CIP), who provided the equity and debt finance for the scheme, purchased the project and setting up the new operating company [[Templeborough Biomass Power Plant Ltd]]<ref name="pdf"[>http://www.volund.dk/~/media/Downloads/Brochures_-_BIO/Templeborough_-_Rotherham_-_England.pdf/Volund/dk]</ref>. In October 2019 London based [[Greencoat Capital]] announced that it had signed an agreement to acquire 100% of Templeborough Biomass Power Plant Ltd from CIP. This project is the company's first move into bioenergy assets<ref>[http://cipartners.dk/greencoat-capital-agrees-first-biomass-acquisition-40mw-templeborough-biomass-power-plant-from-copenhagen-infrastructure-partners/ CIP]</ref>.The total cost of the project was c.£200m GBP<ref>http://www.volund.dk/Biomass_energy/References/Templeborough</ref>.
Line 14: Line 15:
[[B&W Volund]] offered a full turnkey solution to the project with the technology solution based upon their patented [[DynaGrate]] technology<ref name="pdf" />.
[[B&W Volund]] offered a full turnkey solution to the project with the technology solution based upon their patented [[DynaGrate]] technology<ref name="pdf" />.


==Tonnage Input/Fuel==
{{BioSustain|EPR={{#var: epr}}}}
The tonnage received by the plant is primarily [[Wood Waste]] but there is no tonnage reported in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> by [[Ofgem]]. The [[Wood Waste]] tonnage received and recorded in the [[EA]] statistics for the calendar year (i.e. January 2018 to December 2018) was '''68,643''' tonnes.
{{EAIn|EPR={{#var: epr}}}}


==References==
==References==
banneredit
3,643

edits