[[Tilbury Green Power]] (TGP) is a renewable power plant fuelled by [[Wood Waste]], located within the Port of Tilbury on the banks of the River Thames<ref name="TGP">[https://www.tilburygreenpower.com/ Tilbury Green Power]</ref>. The plant has a capacity of around 40 MWe<ref name="TGP" />.
[[Category:Biomass EfW Plants]]{{#vardefine: epr|KP3936ZB}}
[[Category:Biomass EfW Plants]]{{#vardefine: epr|KP3936ZB}}
{{BiomassPlant|NAME = Tilbury|id=82|EPR={{#var: epr}}}}
{{BiomassPlant|NAME = Tilbury Green Power|id=82|EPR={{#var: epr}}}}
[[File:TGP.png|300px|left|Picture from 2019 Annual Report Cover Page]]__TOC__
[[File:TGP.png|300px|left|Picture from 2019 Annual Report Cover Page]]__TOC__
<br clear='left'/>
<br clear='left'/>
==Summary==
==Summary==
Tilbury Green Power Limited (TGP) is a renewable power plant fuelled by [[Wood Waste]], located within the Port of Tilbury on the banks of the River Thames<ref name="TGP">[https://www.tilburygreenpower.com/ Tilbury Green Power]</ref>. The plant has a capacity of around 40 MWe<ref name="TGP" />.
[[Tilbury Green Power]] (TGP) is a renewable power plant fuelled by [[Wood Waste]], located within the Port of Tilbury on the banks of the River Thames<ref name="TGP">[https://www.tilburygreenpower.com/ Tilbury Green Power]</ref>. The plant has a capacity of around 40 MWe<ref name="TGP" />.
 
The plant uses up to 270,000 tonnes of [[Wood Waste]] per annum<ref name="TGP" /> which is provided by [[Stobart Biomass]] who source the fuel for the plant from the local catchment area, which is then processed at the onsite facility<ref name="GIB">[https://greeninvestmentgroup.com/news-and-insights/2015/uk-green-investment-bank-and-esb-support-new-190m-renewable-electricity-plant-on-the-thames/ Green Investment Bank]</ref>.


The Tilbury Green Power Plant was developed by [[Tilbury Green Power Limited]], the major shareholders at the time being the [[Electricity Supply Board]] (ESB) and the [[UK Green Investment Bank]] (GIB) (now called [[Green Investment Group]]). [[Burmeister and Wain Scandinavian Contractor]] (BWSC) and [[Aalborg Energie Technik]] (AET) were minor shareholders<ref name="TGP" />. GIB and ESB each invested £35m to the project as a combination of equity and shareholder loans, with an additional £2m participation from the technology provider AET<ref name="GIB" />. Senior debt funding was provided by the [[Danish Export Credit Agency]] (Eksport Kredit Fonden), [[Investec]] and [[Rabobank]]<ref>https://www.aet-biomass.com/en-GB/Home/References/Biomass-fired-Plants/Tilbury-Green-Power-London.aspx</ref>. The total cost of the project amounted to £190m<ref name ="GIB" />.
The Tilbury Green Power Plant was developed by [[Tilbury Green Power Limited]], the major shareholders at the time being the [[Electricity Supply Board]] (ESB) and the [[UK Green Investment Bank]] (GIB) (now called [[Green Investment Group]]). [[Burmeister and Wain Scandinavian Contractor]] (BWSC) and [[Aalborg Energie Technik]] (AET) were minor shareholders<ref name="TGP" />. GIB and ESB each invested £35m to the project as a combination of equity and shareholder loans, with an additional £2m participation from the technology provider AET<ref name="GIB" />. Senior debt funding was provided by the [[Danish Export Credit Agency]] (Eksport Kredit Fonden), [[Investec]] and [[Rabobank]]<ref>https://www.aet-biomass.com/en-GB/Home/References/Biomass-fired-Plants/Tilbury-Green-Power-London.aspx</ref>. The total cost of the project amounted to £190m<ref name ="GIB" />.
Line 15: Line 14:


==Plant==
==Plant==
The construction of the plant commenced in August 2015 following completion of site preparation works which began in May 2015. The plant became fully operational in January 2019<ref name="TGP" />. [[BWSC]] were appointed the [[EPC]] contractor and [[O&M]] contractor for the project<ref name="GIB" /> with [[AET]] designing, supplying and commissioning the boiler, flue gas and combustion systems, the latter of which is based upon the travelling grate ([[AET Biograte]]) system<ref>https://www.aet-biomass.com/en-GB/Home/References/Biomass-fired-Plants/Tilbury-Green-Power-London.aspx</ref>.
The construction of the plant commenced in August 2015 following completion of site preparation works which began in May 2015. The plant became fully operational in January 2019<ref name="TGP" />. [[BWSC]] were appointed the [[EPC]] contractor and [[O&M]] contractor for the project<ref name="GIB" /> with [[AET]] designing, supplying and commissioning the boiler, flue gas and combustion systems, the latter of which is based upon the travelling [[grate]] ([[AET Biograte]]) system<ref>https://www.aet-biomass.com/en-GB/Home/References/Biomass-fired-Plants/Tilbury-Green-Power-London.aspx</ref>.


==Tonnage Input/Fuel==
{{BioSustain|EPR={{#var: epr}}}}
The tonnage received by the plant in the most recent [[Annual Sustainability Report]] for 2018-19<ref>[https://www.ofgem.gov.uk/publications-and-updates/biomass-sustainability-dataset-2018-19 Biomass Sustainability Dataset 2018-19]</ref> was reported by [[Ofgem]] as follows:
{{EAIn|EPR={{#var: epr}}}}
{| class="wikitable"
|-
! Biomass !! Tonnage (2018-19)
|-
| [[Wood Waste]] || '''171,993'''
|-
| Other || 0
|-
| Total||171,993
|}
The [[Wood Waste]] tonnage received cannot be directly compared with the stated historical tonnage received and recorded in the [[EA]] statistics as these are recorded on a calendar year basis (i.e. January 2018 to December 2018) and was '''172,408''' tonnes.


The plant uses up to 270,000 tonnes of [[Wood Waste]] per annum<ref name="TGP" /> which is provided by [[Stobart Biomass]] who source the fuel for the plant from the local catchment area, which is then processed at the onsite facility<ref name="GIB">[https://greeninvestmentgroup.com/news-and-insights/2015/uk-green-investment-bank-and-esb-support-new-190m-renewable-electricity-plant-on-the-thames/ Green Investment Bank]</ref>.