A [[Biomass EfW]] facility, [[Ince Biomass Power Plant]] is based on processing up to 157,000 tonnes per annum of waste wood producing 21.5 MW of electricity that is exported to [[nPower]] under a long-term [[Power Purchase Agreement]]. The facility is located at Protos in Cheshire, and forms part of [[Peel Environmental]]’s ‘[[Protos]]’ energy hub located near Ellesmere Port<ref name="ref2" />. The [[Wood Waste]] feedstock is sourced locally through a contract with [[Ince Park Renewables]]<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020].</ref>.
A [[Biomass EfW]] facility, [[Ince Biomass Power Plant]] is based on processing up to 157,000 tonnes per annum of waste wood producing 21.5 MW of electricity that is exported to [[nPower]] under a long-term [[Power Purchase Agreement]]. The facility is located at Protos in Cheshire, and forms part of [[Peel Environmental]]’s ‘[[Protos]]’ energy hub located near Ellesmere Port<ref name="ref2" />. The [[Wood Waste]] feedstock is sourced locally through a contract with [[Ince Park Renewables]]<ref name="ref1" >CoGen, 2018. [https://www.cogenuk.com/projects Projects — Cogen. Online. CoGen. [Accessed 3 April 2020].</ref>.


The operations & maintenance for the facility is being carried out by [[Stantec]]<ref name="ref1" />. Construction commenced in 2015 and Ince Bio Power became fully operational in March 2015<ref name="ref2" />.
The [[O&M Contract]] for the facility is being carried out by [[Stantec]]<ref name="ref1" />. Construction commenced in 2015 and Ince Bio Power became fully operational in March 2015<ref name="ref2" />.