The second largest High Temperature Incinerator site in the UK, permitted to handle up to 48.000 tonnes per annum[1], Tradebe's Fawley HTI is a rotary kiln designed to treat hazardous waste and low level radioactive waste.


Fawley HTI
Site Location
Site Location

See HT & Clin → page for a larger UK Wide map.

Waste Licence FP3935KL
Operator Tradebe
Operational Capacity 48,000tpa
Number of Lines 1
Region South East

Annual Report Data

Year Total In Total Clinical IBA Out ACP Out Op Hours

2019
2018 39728 2800 6008 1712 7144
2017
2020 39151 3662 5180 1429 7065
2021 38161 5752 5507 1390 7503
2022 37152 5061 4614 1263 7339


Picture of Fawley Hazardous Waste Incinerator - Tradebe UK Image, all rights reserved
Picture of Fawley Hazardous Waste Incinerator - Tradebe UK Image, all rights reserved


Summary

The second largest High Temperature Incinerator site in the UK, permitted to handle up to 48.000 tonnes per annum, Tradebe's Fawley HTI is a rotary kiln designed to treat hazardous waste and low level radioactive waste, and is classed as a upper tier COMAH site[2].

Plant Description

The facility is a Rotary Kiln which is capable of handling a wide range of wastes, there are two primary waste output streams from the process, a slag ash generated from the incineration process and a filter cake extracted from the water used in the flue gas cleaning process[3].

The incinerator operates at a temperature of c.1000°C to ensure the destruction of hazardous waste resulting in typical volume reductions of 80%. The facility is able to process difficult chemical and industrial waste streams not suitable for alternative treatment or disposal options[4]. The query SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='FP3935KL' LIMIT 1 is invalid (Error : SSL SYSCALL error: EOF detected

Function: EDConnectorRdbms::fetch Query: SELECT "updated" FROM "db_ea"."ea_ew_in" WHERE epr='FP3935KL' LIMIT 1 ).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).Error: Could not connect to database (Cannot access the database: Unable to connect to PostgreSQL server: connection to server at "10.106.0.2", port 5432 failed: FATAL: the database system is in recovery mode).

Waste Tonnage, By Origin

The table shows a list of the Waste for the Permit FP3935KL, that has arrived into sites as reported to the Regulator and then publicised in their reported statistics. The Data used is from the most recent returns. The total reported tonnage arriving at the site was: Expression error: Unexpected < operator.t.

Where this tonnage exceeds that reported in year of the corresponding annual report, this may be due to the following reasons:

  • Tonnage may have been received but not incinerated, i.e. the material is held pending incineration (the operator return to the EA reports as received whereas the annual report focuses on when the waste is incinerated.)
  • Material may have been received into the site but treated in some other way than incineration.
  • Material may have been received on the but transferred out of site for disposal/treatment at another site rather than incineration on the site.
EWC Code Origin of Waste Tonnes In


References

  1. Annual for Site for 2020, Submitted by Tradebe to the EA Spring 2021
  2. https://www.tradebe.co.uk/high-temperature-incineration
  3. Annual Operators Performance Report 2020
  4. [1]