Lincolnshire EFW: Difference between revisions

Northern Chick (talk | contribs)
Northern Chick (talk | contribs)
→‎Summary: new text
Line 6: Line 6:
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. The North Hykenham Energy from Waste facility as its also known has a permitted operational capacity of 190,000 tonnes per annum, and is owned and operated by FCC Environment. The waste arrives on 10 and 25 tonne collection vehicles from the local Lincoln area and five waste transfer stations based in Boston, Gainsborough, Grantham, Louth and Sleaford. <ref name="NH">https://www.fccenvironment.co.uk/green-energy/lincoln/</ref> The facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]].
An EfW facility based upon conventional combustion technology and considered an ERF based on its R1 status. The North Hykenham Energy from Waste facility as its also known has a permitted operational capacity of 190,000 tonnes per annum, and is owned and operated by FCC Environment. The waste arrives on 10 and 25 tonne collection vehicles from the local Lincoln area and five waste transfer stations based in Boston, Gainsborough, Grantham, Louth and Sleaford. <ref name="NH">https://www.fccenvironment.co.uk/green-energy/lincoln/</ref> The facility processes primarily residual [[Household Waste]] and some [[Commercial Waste]].


The Lincolnshire Energy from Waste facility is located on a 5 hectare site in Lincolnshire (just outside the village of North Hykenham) about 1.5km Northwest of Lincoln City.<ref>https://www.whatdotheyknow.com/request/260104/response/645233/attach/20/2014%20Annual%20Performance%20Report.pdf</ref>
The Lincolnshire Energy from Waste facility is located on a 5 hectare site in Lincolnshire (just outside the village of North Hykenham) about 1.5km Northwest of Lincoln City.<ref name="AR">https://www.whatdotheyknow.com/request/260104/response/645233/attach/20/2014%20Annual%20Performance%20Report.pdf</ref>


==History==
==History==