banneredit
3,639
edits
(add page specific text) |
(add new link) |
||
Line 7: | Line 7: | ||
==Summary== | ==Summary== | ||
An [[EfW]] facility based upon conventional [[combustion]] technology, located at Westfield Opencast Site, Fife in Scotland. The [[Westfield EfW Plant]] is forecast to have a maximum capacity of 240,000 tonnes per annum generating 23MW with around 21.5MW of electricity exported. The site is owned by [[Hargreaves Services]] and was developed by [[Brockwell Energy]]<ref>[https://www.brockwellenergy.com/our-projects/energy-from-waste/westfield-energy-centre/ Brockwell Website]</ref>. | An [[EfW]] facility based upon conventional [[combustion]] technology, located at Westfield Opencast Site, Fife in Scotland. The [[Westfield EfW Plant]] is forecast to have a maximum capacity of 240,000 tonnes per annum generating 23MW with around 21.5MW of electricity exported. The site is owned by [[Hargreaves Services]] and was developed by [[Brockwell Energy]]<ref>[https://www.brockwellenergy.com/our-projects/energy-from-waste/westfield-energy-centre/ Brockwell Website]</ref>. | ||
In September 2022 it was announced that [[Westfield Energy Recovery Ltd]] (the owner of the project) was sold by [[Brockwell Energy]] to [[Equitix]]<ref>[https://www.letsrecycle.com/news/equitix-acquires-fife-efw-plant/ Letsrecycle Article September 2022]</ref>. | |||
It is expected that the facility will become operational by early 2025<ref name="ref1" >Earls Gate Energy Centre, 2020. [https://pioneerpoint.com/brockwell-energy-reach-financial-close-on-westfield-efw/ Pioneer Point Partners. Online. [Accessed 21 Dec. 2021].]</ref>. | It is expected that the facility will become operational by early 2025<ref name="ref1" >Earls Gate Energy Centre, 2020. [https://pioneerpoint.com/brockwell-energy-reach-financial-close-on-westfield-efw/ Pioneer Point Partners. Online. [Accessed 21 Dec. 2021].]</ref>. |