UPM Shotton Boiler 7

From WikiWaste
Revision as of 04:24, 13 April 2020 by Northern Chick (talk | contribs) (Created page with "Category: Biomass EfW Plants {{BiomassPlant|NAME=Shotton|id=69}}")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN