UPM Shotton Boiler 7

From WikiWaste


Error: no local variable "site" has been set.
Error: no local variable "status" has been set.
Site Location
Site Location

See Biomass EfW → page for a larger UK Wide map.

Operator Error: no local variable "operator" has been set.
Capacity Error: no local variable "capacity" has been set. MWe
Feedstock Error: no local variable "mainfeed" has been set.
EPR (Waste Licence) Error: no local variable "epr" has been set.
ROC Error: no local variable "roc" has been set.
CfD Error: no local variable "cfdcap" has been set.
CHP Error: no local variable "chp" has been set.

Operators Annual Report


Input Data

Year Wood Litter RDF Other Total


Output Data

Year IBA IBA %ge of Tot IN APC APC %ge of Tot IN

Summary

A Biomass Waste CHP EFW based at the UPM Shotton newsprint mill in Flintshire, north Wales generating 24.8 MWe[1] from a feedstock of waste paper, fibre and sludge[2]. The plant provides up to 70% of the paper mill's energy production[1]. Most of the energy is consumed in the manufacture of mechanical pulp, pumping and paper drying[3]. In 2016 a second steam turbine was brought on line at the facility which utilises excess steam from the biomass CHP plant[4].

Plant

The technology in use at the plant is a Bubbling Fluidised bed system[2].

Local Authority Users

The plant manufacturers newsprint solely from recovered paper which is received from a number of local authority contracts throughout the UK.

References